The project involved the construction of a 8 storey building containing 82 units 6665m2 in total.

The project incorporates AFS Logicwall 150mmm and 200mm permanent formwork system which delivers a monolithic concrete superstructure with inherent fire proofing, sound attenuation and thermal mass benefits.

The use of the Logicwall system was ideal for this project as the access to the site was extremely restricted.

Contractor for London Project

"This site had extremely restricted access and was straight off a London bus red route.

Thanks to the fact we were getting deliveries of up to 500m2 per load we were able to keep vehicle movements to a minimum but still achieve a fast construction cycle.

Eliminating all the blockwork from the job and the associated hassles that normally go with it was another huge plus ! "