AFS Logicwall® construction: a permanent formwork system

Whether you’re a developer, building contractor, architect or engineer, you know that the cost and timeline pressures of today’s fast-moving construction industry mean you need to work with smart solutions that meet strict standards, yet assist with swift project completion.

Helping to reduce onsite labour requirements and construction times can be a significant factor for being repeatedly contracted as a trusted partner. With logicwall®, a cutting edge lightweight permanent formwork system, you can achieve both objectives, with the best substrate results for quick and attractive finishing.

Panel Installation

  • 1
    Step 1

    Floor track - Floor track is fixed to the marked out slab over reinforcement starter bars.

  • 2
    Step 2

    Easy lift - Panels are erected by hand – teams of three men per panel, using a set technique.

  • 3
    Step 3

    Bracing - Walls are temporarily braced at panel joints with purpose-built adjustable braces.

  • 4
    Step 4

    Reinforcement - Vertical and horizontal reinforcement bars are placed in walls to project engineer’s specification.

  • 5
    Step 5

    Wall straightening - Panels are plumbed and straightened with levels and string lines.

  • 6
    Step 6

    Electrics - Electrical conduits are installed from the top of the panel.

  • 7
    Step 7

    Panels After the installation process is complete the panels are then core filled with concrete using concrete pumping methods, generally using a boom pump.